(with Jenny’s help) all of the floorboards have been fully treated on the reverse side, cut to fit, and placed in situ on the roof, with the outside boards only fixed in place. Next, I plan to “water” the floor (there is no rain forecast) to see if it buckles up…
… and then (as there is no rain forecast) turn each board over, allow to dry, fix down, sand, and treat with two coats of the brown decking oil.
Dance floor-boards in place (upside down!)…
Bookmark the permalink.
Looks good Andrew, hope that there will be some more dry weather and sunshine when it comes to trying it out!